Acoustic Testing

  • Contact Us
  • Resources Centre
  • Events
News

We offer a complete acoustic consultation service, capable of assisting developers from design through to completion.

Extensive experience - amassed over many years - enables us to identify the remedial measures needed to bring a substandard structure up to the level required for compliance. Since our team of acoustic engineers is dispersed nationwide, we are able to keep lead times to a minimum and offer highly competitive fees.


Having achieved UKAS accreditation in 2006, Stroma's acoustic testing and consultancy team is ideally positioned to assist you with any regulatory requirement.

Our early involvement can assist the project architect in meeting the design criteria from the outset, thus saving both time and expense during the build stages. If we are involved from the conception of the project, any changes to the design can be quickly evaluated and any necessary adjustments put in place with minimum disruption.
Part E pdf is available to download in our resources section.

 
  Environmental Noise   Architectural Noise   Pre-Completion   Educational   Site Requirements  

 

Environmental Noise

 

The acquisition of planning permission for a new building project is often contingent on the impact of noise - from both the construction site and the completed building - on noise levels in the immediate area. A common request is for an initial site survey to be carried out to ascertain the existing noise levels of a proposed construction site and determine how the completed building will affect the surrounding area.

Stroma can conduct pre-application measurements and site assessments to satisfy such requests, liaising with both architects and local planning and environmental health officers.

This includes:

  • Taking measurements to confirm planning conditions and negotiations for variations
  • Undertaking Planning Policy Guidance assessments under PPG24 and BS4142
  • Identifying prospective complaints that may arise from existing sites
Where a developer is hoping to obtain planning consent for new housing, an assessment under Planning Policy Guidance Note 24 (PPG24) can be undertaken and a report produced. This can usually be conducted within two weeks of receiving the request. Where industrial developments are taking place, measurements and assessments using British Standard 4142 are carried out. These are weather dependent - as with PPG24 assessments - but can usually be undertaken within two weeks of a request. Assistance is also available for developers who are planning and building new schools. Advice can be given from the design stage through to completion, using Building Bulletin 93 (BB93).

Stroma provides:
  • Measurements to confirm planning conditions and negotiations for variations
  • Planning Policy Guidance assessments (PPG24, BS4142 & BB93)
  • Noise measurement surveys
  • Statutory noise nuisance - advice and appeals
  • Measurement and prediction of transportation noise
  • Construction site and demolition noise and vibration
  • Advice on legislation
Download Planning Policy Guidance 24: Planning and Noise

 

 

 